Technical information

Pit Required: 70 mm (or 0 mm with ramp)

Machine Room: None (integrated)

Min. Top Floor Height: 2,500 mm

Door Clear Opening Height: 2,100 mm (1,900 mm optional)

Installation Time: 5-7 Days (for 2 Stops)

Location: Indoor

Load Capacity: 400 kg

Speed: 0.15 m/s

Max. Stops: 6 stops

Max. Travel Height: 20,000 mm

Drive System: Screw Drive (EcoSilent 2.0)

Glass: Tempered Laminated Glass (9mm)

Safety Standards: MD 2006/42/EC, EN81-41 (SIL3)

Warranty: 3+5+15 years

Safety Device: Safety Edge, Safety Bar, Phone, and Emergency Button

Power Supply: 1-phase 220V / 3-phase 380V

Motor: PMSM Ultra Silent

Rated Power: 2.9 kW

Main advantages

All-inclusive lift concept

Multiple sizes, shaft finishes, glass options, doors, floors, and interior details allow the lift to integrate with different architectural and interior concepts.

Minimal structural impact

No separate machine room, no counterweight, and no deep pit required, helping reduce major construction work in new and existing buildings.

Fast & easy installation

Prefabricated screw-driven components support efficient on-site assembly, with typical 2-stop installation completed in approximately 5-7 days.

Long-Term Service Confidence

Cibes Lift Thailand provides in-house installation and service by factory-trained engineers, with no third-party subcontractors, nationwide support, genuine parts, and preventive maintenance.

Lift sizes & floor cut out information

Cut out size

The cut out size refers to the minimal dimensions of the pit and the opening through the floors (width x depth, mm) required to install the lift.

Cut-out diagram

Downloads

FILE Cibes Product Catalog
Download
FILE Cibes Air 2 Product Sheet
Download
PDF Cibes Air 2 Sample Book
Download
FILE Cibes Air 2 Lift Layout Plan
Download
FILE Cibes Air 2 Drawing
Download
FILE Cibes Reference Book
Download

Ready to Consult with Our Experts?

Free consultation, free site survey, and get your personalized quote

Mon-Sat 9:00-18:00 Visit Showroom [email protected]